(443) 540-7985

Maryland's Basement Finishing Specialists

Turn your unfinished basement into living space — in-law suite, home theater, gym, bar, kids' playroom. Permits pulled, structurally sound, ready in 4-8 weeks.

Get Free Estimate(443) 540-7985
MHIC #108556Licensed
Since 2010Family-Owned
Permits IncludedAll Counties
2-YearWorkmanship Warranty

Basement Services

Full Basement Finish

Framing, insulation, drywall, electrical, plumbing, flooring, ceilings. Open layout or sub-divided rooms. From $35K, 4-6 weeks.

In-Law Suite

Bedroom + bathroom + kitchenette + private entrance. Increases home value 60-90% of cost. From $55K, 6-8 weeks.

Home Theater

Tiered seating, soundproofing, projector + screen, surround sound, dimmable lighting, blackout doors. From $25K, 3-4 weeks.

Gym / Workout Room

Rubber flooring, mirrors, ventilation, dedicated electrical for equipment. Often paired with sauna or shower addition.

Wet Bar / Entertainment

Custom bar with refrigeration, sink, ice maker, glass storage, optional kegerator. Open to lounge area or theater.

Walk-Out Conversion

Existing basement window enlargement to walk-out door. Egress code-compliant, structural lintel installed.

Get Your Free Quote

Tell us about your basement project. Free in-home estimate within 24 hours.

No obligation. Privacy respected.

Frequently Asked

How much does basement finishing cost in Maryland?

Full basement finishes range $35K-$80K. In-law suites $55K-$95K. Home theaters $25K-$50K. Free written quote after on-site consultation.

Do I need permits?

Yes — Maryland requires permits for any basement finish that adds bedrooms, bathrooms, electrical, or plumbing. We pull all permits as part of the project.

What about basement waterproofing?

If your basement has moisture issues, we recommend addressing them BEFORE finishing. We partner with waterproofing specialists if needed. Otherwise, we install proper vapor barrier and dehumidification.

Will egress windows be needed?

Yes for any bedrooms in the basement — Maryland code requires egress windows in all basement bedrooms. We include egress installation in basement bedroom projects.

How long does it take?

Most full basement finishes take 4-6 weeks. In-law suites 6-8 weeks (more inspections, kitchenette plumbing). We give you a written schedule with the proposal.

Call: (443) 540-7985